Site Overlay

Projects

Fenced Perimeter

Draft: 16 Metres
3 berths: 2 for Agricultural Products, 1 for Petroleum Products
Bulk Cargo of solid minerals of 150,000-250,000MT capacity per month
Modern, refurbished and rehabilitated logistics port jetties, dockyard, storage tanks, fabrication yard
Pilot station

PHASE 1B
Draft: 18m
Rehabilitated recreation facilities, engineering workshops and facilities, staff residential quarters.
Hydrolift dock for super and FPSO vessels
230,00CMT oil and gas tank farm
32km link road to all project sites

PHASE 2
Draft dredged to 25m
Offshore copside facilities including independent power plant (JPP) together with gas pipelines
Air strip
50km additional link road

PHASE 3
600,000MT oil and gas tank farm
4 barths, each of 420m longth overal
FPSO, FSO, VLCC Facilities